amymanifolds@cn-kangtai.com    +86-574-58220250
Cont

Vai ir kādi jautājumi?

+86-574-58220250

video

Stainless steel manifold with Epp insulation, a device specifically designed to prevent water pipes from freezing and keep water temperatures stable. In winter, the lower temperature weather is easy to make the water pipe ice, especially in the outdoor water pipe is more susceptible to the temperature, Using manifolds with EPP insulation can effectively prevent the water pipe ice, to ensure the normal supply of water.
Nosūtīt pieprasījumu

Produkta ievads

 

Stainless steel manifold with Epp insulation including flowmeter and cartridges, nipples, plugs and brackets; The thread is M30*1.5mm threaded and can be matched with electric actuators. It is a high-end manifold that can meet the heating needs of humans. The center distance of the product is 50mm, the main rod surface can be smooth or sanded, flow meter can be selected for brass flow meter and plastic flow meter; We can customize the manifold you want according to the customer's request and budget. The warranty of our products is guaranteed for 2-5 years.

 

 

Kangtai has more than 50 sets of automatic machine equipment, which can realize multiple machines for one person, and the output can reach 2000 sets of manifolds per day. There is also a 30% surplus production capacity to meet customer needs. Wishes customers order more.

Safety and rest assured: a sealing ring is added between the ball valve of the manifold and the main pipe of the water distributor, with high-quality anaerobic rubber sealing connection, double protection, and tight safety.

Beautiful and durable: equipped with a beautiful and durable sideboard, the sideboard surface is made of spray plastic process, beautiful and generous, for long-term use.

 

1.Q: How long is your delivery time?

A: Generally it is 10-15 days if the goods are in stock. Otherwise, it is 35-45 days.

2. Q: What certificates do your factory have?

3. Q: Why choose your factory?

4. Q: How long is the warranty time?

A:2-5Years.

5. Q: What's your payment term?

A:1. T/T 30% as deposit before production, the balance before shipment.

2. L/C at sight (for large quantity order)

3. 100% T/T in advance.

 

 

Water,glycol solutionsMax. percentage of glycol is 30%

5~100 degree

10bar

G1"

G3/4"

50mm

 

product-677-637

product-224-324   product-286-267

 

 

product-910-84

 

Populāri tagi:

Nosūtīt pieprasījumu

(0/10)

clearall